Catalog Home Page

Property of P Capito and Company, Bodallin, Western Australia, Australia - 003

Property of P Capito and Company, Bodallin, Western Australia, Australia - 003. [Document] [Special Collections]

[img]
Preview

Summary

Surveyor's Report on WISALTS Soil Conservation System created by A (Alan) Nicholson and G Maddock.

Comments: Main North Bodallin creek where water covers about 300 acres of clients property. Dotted line denotes drain to be dug with scraper to drain sunken area out from lake. Dirt dug out to be used as fill for flyover on Shire road (Shires permission obtained). Shire will also install culvert to drain line after main water has stopped running. Telecom and the water supply are being contacted to move their 4 inch fibro pipe and underground phone line. Most part of creek has between 0.5 and 2 centimetres in 30 metres grade so drain went silt up. In future level banks will need to be installed to control water running into creek behind bank.

This document is part of the WISALTS (Whittington Interceptor Sustainable Agriculture Land Treatment Society Incorporated) Collection.

Date: 6 October 1982
Item Type: Special Collections
Collection: WISALTS Collection
URI: http://researchrepository.murdoch.edu.au/id/eprint/46464
Item Control Page Item Control Page

Downloads

Downloads per month over past year