Murdoch University Research Repository

Welcome to the Murdoch University Research Repository

The Murdoch University Research Repository is an open access digital collection of research
created by Murdoch University staff, researchers and postgraduate students.

Learn more

Review of time required for EIA. Report to Western Power, Perth

Morrison-Saunders, A. (2003) Review of time required for EIA. Report to Western Power, Perth. School of Environmental Science, Murdoch University, Murdoch, Perth.

[img]
PDF - Published Version
Download (202kB)

Abstract

This is a review of the time taken for EIA in Western Australia for comparison with the time taken for the PER assessment of the Pinjar to Cataby transmission line. For the time required for undertaking EIA, two comparisons are made: one is a comparison with typical assessment of proposals; the second is with projects that have involved contentious issues.

Item Type: Report
Murdoch Affiliation(s): School of Environmental Science
Publisher: School of Environmental Science, Murdoch University
URI: http://researchrepository.murdoch.edu.au/id/eprint/3272
Item Control Page Item Control Page

Downloads

Downloads per month over past year