Brockman syncline 4 - Primary crushing facility

Combes, Elliot (2008) Brockman syncline 4 - Primary crushing facility. Internship Report, Murdoch University.

[img]
Preview
PDF
Download (740kB) | Preview

    Abstract

    This report presents the research and work completed by the author during completion of a 16 week Internship as part requirement of the completion of a Bachelor of Engineering with Murdoch University. Incorporating the project work surrounding the design and implementation phase of a green-field project for a client in the iron ore industry. The name of the project/plant being constructed is Brockman Syncline No.4 and the tasks associated with the project undertaken relates to Instrumentation and Control. This report provides background to the project and an overview of the area of focus whist providing more in-depth research in the particular area to provide the reader with a sound background and knowledge into the operation of the equipment in the plant. Other aspects of the project and associated tasks are also presented including the allocation of the IO in the distributed IO system implementation and also the testing practices for testing of PLC code written by other engineers in the team. Whilst the tasks undertaken throughout the internship are broad they are linked by the work being completed simultaneously by the other members of the team.

    Publication Type: Internship Report (Bachelor of Engineering)
    Murdoch Affiliation: School of Engineering and Energy
    URI: http://researchrepository.murdoch.edu.au/id/eprint/17
    Item Control Page

    Downloads

    Downloads per month over past year